Industry news|2022-06-06| admin
The installation of the planetary gearbox is a relatively simple process, but some details need to be paid attention to during the installation process. The installation process of the planetary gearbox is roughly divided into three steps: inspection size, installation, and testing. The main thing is to confirm the planetary gear. The coaxiality of the gearbox during installation will have a great impact, so let's learn about the installation process of the planetary gearbox and some precautions!
Before installing the planetary gearbox and the motor, it is necessary to confirm whether they are in good condition, and it is necessary to check whether the dimensions of the connected parts match, mainly referring to whether the installation size between the motor and the gearbox is correct.
Send the screws of the dust-proof holes on the outer side of the planetary gearbox, adjust the position to align the side holes and the dust-proof holes, remove the motor shaft key, and carry out anti-rust treatment on the installation parts of the motor and the gearbox to ensure the tightness of the connection and the later operation. of fluency.
When connecting, it is necessary to ensure that the coaxiality between the two is consistent. If it is inconsistent, it will affect the later operation, wear the internal gear of the gearbox or break the shaft. During the installation process, it is forbidden to hit the gearbox with a hammer to prevent damage caused by excessive axial force or radial force.
When the gearbox and the motor are connected, first install the diagonal screws to ensure uniform force, then install the other two diagonal bolts, tighten the four mounting bolts one by one, and finally tighten the captive screws on both sides, some high-precision installation requires the use of a torque wrench.
After the gearbox is installed, it needs to be fixed on the bracket, and the stability of the installation needs to be ensured. If the gearbox is unstable during high-speed operation, it may cause vibration and external noise, which will indirectly affect the coaxiality of the installation. When gears or other components are externally installed during transmission, protective devices need to be installed. After the installation is completed, check the stability and flexibility of the installation parts in turn, and the idling test can be carried out. The operation process should be relatively stable, without obvious vibration and noise. When there are some abnormal phenomena, the problem should be eliminated.
The planetary gearbox needs to be carefully installed during the installation process. Good installation can achieve twice the result with half the effort. Installation according to standard procedures can save a lot of maintenance costs in the later period. If the coaxiality is inconsistent during installation, it will have a great impact on the later use and the gearbox itself. Therefore, during the installation of the gearbox, attention must be paid to the coaxiality of the gearbox and some details.
| 国产真人做爰视频免费 | 少妇与大狼拘作爱一级A片入口 | 96久久夜色精品国产九色杨思敏 | 国产免看一级a一片成人AV | 香蕉一级婬片A片久久精 | 久久99久久99精品免视看婷婷 | 全免费A级毛片免费视频播放 | 拍真实国产伦偷精品 | 国产一级A片久久久免费看快餐 | 国产婬乱片A片AAA毛片下载 | 亚洲成人一区二区 | /乱熟乱熟农村少妇一区二区 | 四川乱子伦视频国产 | 免费黄色视频大全 | 成人性生交大免费看 | 四川性BBB搡BBB爽爽爽小说 | 无套内谢少妇免费观看 | 潮喷失禁大喷水无码樱井ZZ | 最好的2018中文大全在线观看 | japanese在线| 亚洲中文一区二区 | 免费看A片18 的视频 | 国产婬A片999片免费网站 | 经典媚黑国产精品合集 | 无码精品ThePorn | 国产一区在线视频 | 少妇老师洗澡被操爽a片软件 | 影音先锋亚洲资源站 | 红桃熟妇人妻熟女视频 | 91丨人妻丨国产丨蚪窝 | 人妻少妇看A片偷精品视频天美 | 一区二区三区精品 | 亚洲精品秘 无码一区二区久 | 专干老熟女300部 | 91爱豆传媒国产成人网站 | 一本一道久久a久久精品蜜桃 | 粉嫩99精品99久久久久久 | 国产又大又粗又硬 | 4444www大胆无码视频α级 | 成人做爰黄70片视频 |